You are switching from another EMR, CRM, or practice management system. Migration today is service-led: there is no self-serve import wizard that takes a folder of CSVs and produces a populated tenant, and there is no customer-self-service sandbox. The work below describes what to bring, in what order — Hoopoe's onboarding team runs the actual import scripts against your data. Allow 4 to 8 weeks depending on data volume and quality.

Coming soon. The behaviour described below is on the roadmap. Today: no packaged self-serve importers exist for patients, invoices, packages, stock, visit history, leads, or employees. There is no coordinated import-runner UI and no customer-provisioned sandbox tenant. The onboarding team runs one-off scripts on your behalf.

What to bring (in priority order)#

  1. Patient records, identity + contact + demographics + MRN. Mandatory.
  2. Patient consents and clinical alerts (allergies), mandatory for safety.
  3. Active treatment plans and prescriptions, mandatory for clinical continuity.
  4. Outstanding invoice balances, mandatory for finance.
  5. Active package balances, mandatory if you sell packages.
  6. Active insurance policies, mandatory if you bill insurance.
  7. Stock on hand, recommended; alternative is a fresh count.
  8. Visit history, recommended for clinical context.
  9. Invoice history, optional; consider a fixed date cutoff (last 12 to 24 months).
  10. Marketing leads in active funnel, recommended.
  11. Employee records and historical attendance, recommended.

What to consider leaving behind#

  • Very old visit history (5+ years).
  • Legacy paid invoices (accounting kept in the old system as archive).
  • Dormant patients (not seen in 24+ months).
  • Completed treatment plans.
  • Closed insurance claims.
  • Inactive staff records.

Phase 1, prepare the export from the old system#

  1. Identify what the old system can export (CSV, JSON, database dump).
  2. Define the cutoff date (everything before X is archive only).
  3. Clean up: dedupe patients, fix obvious data errors, mark dormant.
  4. Hand each category to the Hoopoe onboarding team as its own file. The team's scripts expect CSV with a documented column layout per category; they share the layout doc when the migration ticket opens.

Phase 2, map fields with the onboarding team#

  1. For each category (patients, invoices, etc.), the onboarding team maps the old fields to the new system's fields with you. There is no self-serve mapping UI today.
  2. Some fields will not map. Decide together: drop, transform, or store as notes.
  3. Identify mandatory fields the old system did not have (e.g. new consent slugs); plan how to capture them after migration during normal patient interactions.

Phase 3, dry-run on a Hoopoe sandbox#

  1. Open a support ticket to request a sandbox tenant. Sandbox tenants are not customer self-serve; the Hoopoe team provisions one on request and gives you read-write access for a fixed window.
  2. The onboarding team runs the import scripts on a small sample (50 to 100 records per category) against your sandbox.
  3. Walk the sandbox with your accountant and clinical lead. Verify: patient drawer looks right, invoices have the right balance, packages have the right remaining credits.
  4. Adjust mappings until clean. Each pass takes 24 to 72 hours.

Phase 4, full import#

  1. Schedule the cutover window with the onboarding team (typically 24 to 48 hours).
  2. Final export from the old system on the cutoff date.
  3. The onboarding team runs the full import in dependency order: patients first, then invoices, then packages, then stock, then visit history. Each category has its own script; runs are sequenced because invoice import depends on patient import. There is no coordinated import-runner UI — the team operates the scripts.
  4. Verify totals together: patient count matches, AR balance matches, package credits match.
  5. Sign off on the snapshot.

Phase 5, go live on the new system#

  1. Train staff during the import cutover.
  2. First day live: owner on site, support hotline open.
  3. Coordinate read-only access on the old system with your previous vendor for the first 90 days. Hoopoe does not enforce or coordinate the old-system cutover; that stays with you and your old vendor.

Phase 6, first month checks#

  1. Daily reconciliation: cash drawer, GL.
  2. Watch for missing fields (patients without consent on file, invoices without seller).
  3. Capture during normal interactions: at next visit, capture missing consents.
  4. End of month: first close.

Things that always go wrong (and how to handle them)#

  • Duplicate patients, even after dedupe. Use the merge tool when found.
  • Phone formats, different countries, different formats. Normalise during import.
  • Different MRN convention, keep the legacy MRN as a secondary identifier; assign new MRN at the new clinic.
  • Invoice currency differences, multi-currency setup may be needed.
  • Outstanding insurance claims, leave open in the old system, do not duplicate.
  • Staff missing licences, capture during onboarding to the new system.

Modules touched#

  • Every module that holds data. Patients, Invoices, Packages, Stock, Employees, Insurance, EMR, Pharmacy.
  • Documents (bulk file import).
  • Accounting cycle (opening balances).
  • Settings (workspace + branches + roles).